// PROJECT

Spelthorne Leisure Centre

Staines-upon-Thames

project Details:

NHE VALUE:

£375,000.00

CLIENT:

Spelthorne Borough Council

ARCHITECT:

GT3 Architects

Contract Period:

August 2023 to August 2024

Contractor:

Willmott Dixon Construction

Willmott Dixon Construction Logo

Deliverables:

Doorsets, Ironmongery, 2nd Fix Carpentry, Gym fitout, Spectator seating, external planters, FF&E

SUMMARY:

One of the world’s most advanced, energy efficient Passivhaus leisure centres.
It is the UK’s largest wet and dry leisure centre to achieve Passivhaus, and the first in London. Designed by GT3 Architects, the facility aims to consume up to 60% less energy compared with a standard new building.

The investment in health, leisure and well-being will see local residents benefit from an eight lane 25m main pool, learner pool, splash pad and spa. Further sports facilities include a 6-court sports hall, three squash courts, 950 square metres of fitness space, two studios, one spin studio and a multi-use room which combines to create two further badminton courts.

There will also be an open plan café and reception space, along with a roof terrace overlooking four small-sided 3G football pitches.