project Details:
NHE VALUE:
£1,500,000.00
CLIENT:
Eurocore Pelham limited
ARCHITECT:
HNW Architects
Contract Period:
October 2022 to January 2024
Contractor:
Osborne Construction

Deliverables:
Internal Carpentry, Doorsets, Ironmongery, FF&E, Kitchens, Bathroom cabinets, Bespoke joinery and Gym fitout. External Cladding system.
SUMMARY:
The Blockhouse, in Pelham Street, Brighton, is made up 135 flats. There are studios, one, two and three-bedroom flats. The six-storey buildings were built on the site of a Victorian school building which was once part of Brighton Met College. Construction of two main residential blocks plus a third block of townhouses. The construction is concrete frame with brick facades. Residents facilities including a gym, reception lounge and cycle storage.